0.6mm AISI 304 Stainless Steel Coil
Get Latest PricePayment Type: | L/C,T/T,D/P,D/A,Paypal |
Incoterm: | FOB,CFR,CIF,EXW,FAS,FCA,CPT,CIP |
Min. Order: | 1 Ton |
Transportation: | Ocean,Land,Air,Express |
Port: | Shanghai,Tianjin,Qingdao |
Payment Type: | L/C,T/T,D/P,D/A,Paypal |
Incoterm: | FOB,CFR,CIF,EXW,FAS,FCA,CPT,CIP |
Min. Order: | 1 Ton |
Transportation: | Ocean,Land,Air,Express |
Port: | Shanghai,Tianjin,Qingdao |
Material: 2b, 600 Series, 300 Series, 500 Series, 200 Series, 400 Series
Standard: Jis, Aisi, Astm, Gb, Din, En
Place Of Origin: China
Species: Coil, Plate
Certification: Rohs, Iso, Ibr, Bv, Sgs
Tolerance: ±1%
Processing Service: Bending, Welding, Decoiling, Punching, Cutting
Product Name: Stainless steel coil
Grade: 2507 310s
Surface: BA/2B/NO.1/NO.3/NO.4/8K/HL/2D/1D
Shape: Flat.sheet
Color: Natural Color
MOQ: 1 TON
Selling Units | : | Ton |
Package Type | : | Standard Sea-worthy Packing or customers' requirements |
Picture Example | : |
The file is encrypted. Please fill in the following information to continue accessing it
Stainless Steel is a corrosion-resistant alloy of iron, chromium and, in some cases, nickel and other metals.Completely and infinitely recyclable, stainless steel is the “green material” par excellence. In fact, within the construction sector, its actual recovery rate is close to 100%. Stainless steel is also environmentally neutral and inert, and its longevity ensures it meets the needs of sustainable construction.
These wide coils are further processed using a range of manufacturing techniques such as slitting, where the wide coil is slit into a multitude of strands; this is where much of the confusion around the terminology comes in. After slitting, the stainless steel forms a batch of coils taken from the mother coil and these are referred to by many different names, including strip coils, slit coils, banding or simply strips.
Stainless Steel Sheet Specifications
Product name | |
Grade | 201,202,304,304L,309, 309S,310S,316,316L,316Ti,317L,321,347H,409,409L,410, 410S, 420(420J1, 420J2), 430, 436, 439, 441, 444, 446 |
Thickness | 0.3mm-6mm(cold rolled),3mm-200mm(hot rolled) |
Width | 1000mm,1219mm(4feet),1250mm,1500mm,1524mm(5feet),1800mm,2000mm or as your requirements. |
Technology | cold rolled,hot rolle |
Delivery time | within 7 days after your deposit, or according the quantity |
Package | Water proof paper+metal pallet+Angle bar protection+steel belt or as requirements |
Architectural decoration, luxury doors, elevators decorating, metal tank shell, ship building,decorated inside the train, as well as outdoor works, advertising nameplate, the ceiling and cabinets, aisle panels, screen, the tunnel project, hotels, guest houses, entertainment place,kitchen equipment, light industrial and so on. |
Surface Finish | Definition | Application |
NO.1 | The surface finished by heat treatment and pickling or processes corresponding there to after hot rolling. | Chemical industry equipment,Industrial tanks… |
2B | Those finished, after cold rolling, by heat treatment, pickling or other equivalent treatment and lastly by cold rolling to given appropriate luster. | Medical equipment, Food industry, Construction material, Kitchen utensils… |
BA | Those processed with bright heat treatment after cold rolling. | Kitchen utensils, Electric equipment, Building construction… |
NO.4 | Those finished by polishing with No.150 to No.180 abrasives specified in JIS R6001. | Kitchen utensils, Building construction, Medical equipment… |
HL | Those finished polishing so as to give continuous polishing streaks by using abrasive of suitable grain size. | Building Construction… |
8K | A mirror-like reflective surface by polishing with finer abrasives over 800 mesh | Reflector, Mirror, Interior-Exterior decoration |
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;for products need new products for special and rare materials,usually need 15-20 days to make shipment.
Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.
Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive.
Airline and sea shipping also optional.
For mass products, ship freight is prefered.
Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.
Q6. How to ensure the quality?
A:Mill Test Certificate is supplied with shipment.
If needed, a Third Party Inspection is acceptable or SGS.